|
|
 |
Excavation |
| This is the first step in developing
the work site. The existing soil/base is excavated to the proper depth and configuration (typically 12"). The excess material is hauled off site. The base is then graded and thoroughly compacted in preparation for the stone installation. |
| |
| |
|
|